INTERGRATION CONSTRUCTION BETWEEN A BOILER AND A STEAM TURBINE AND METHOD IN PREHEATING OF THE SUPPLY WATER FOR A STEAM TURBINE AND IN ITS CONTROL

Details for Australian Patent Application No. 2001226826 (hide)

Owner FORTUM OYJ

Inventors RAIKO, Markku

Pub. Number AU-A-2001226826

PCT Pub. Number WO2002/055846

Priority 20002895 29.12.00 FI

Filing date 2 January 2001

Wipo publication date 24 July 2002

International Classifications

F01K 007/40 Steam engine plants characterised by the use of specific types of engine

F01K 023/10 Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids - with exhaust fluid of one cycle heating the fluid in another cycle

Event Publications

6 February 2003 Application Open to Public Inspection

  Published as AU-A-2001226826

5 February 2004 Application Lapsed, Refused Or Withdrawn, Patent Ceased or Expired

  This application lapsed under section 142(2)(f)/See Reg. 8.3(3). Examination has not yet been requested or directed for this application. Note that applications or patents shown as lapsed or ceased may be restored at a later date.

Legal

The information provided by the Site not in the nature of legal or other professional advice. The information provided by the Site is derived from third parties and may contain errors. You must make your own enquiries and seek independent advice from the relevant industry professionals before acting or relying on any information contained herein. Check the above data against the Australian Patent Office AUSPAT database.

Next and Previous Patents/Applications

2001226829-METHODS FOR INFORMATION DELIVERY IN AN INFORMATION DELIVERY SYSTEM

2001226825-INTEGRATION CONSTRUCTION BETWEEN A BOILER AND A STEAM TURBINE AND METHOD IN PREHEATING OF THE SUPPLY WATER FOR A STEAM TURBINE AND IN ITS CONTROL